Get a Quote

Edit Template

PEB Work

Pre-engineered buildings (PEBs) are buildings that are designed and manufactured off-site, then transported and assembled on-site. The pre-engineered building system involves designing and engineering building components that are then fabricated in a factory, shipped to the site, and assembled on-site using bolted connections.

WHY CHOOSE US

We Follow Best Practices

to convey the commitment to producing high-quality work that meets industry standards and incorporates user-centered design principles. It’s a testament to their expertise and dedication to their craft.

Sustainablility

In the blueprint of progress, sustainability is the cornerstone of responsible construction.

Modern Technology

Modern technology is the cornerstone of efficiency, transforming visions into towering achievements.

Project On Time

We're not just building structures, we're building trust through timely delivery.

Latest Designs

Our company embraces the latest designs to build a future that inspires.

Why PEb work

PEB Work stands for Pre-Engineered Building Work

Pre-Engineered Building represents a modern construction method where the building’s components are manufactured in a factory and then assembled on-site. Overall, the PEB work involves careful planning, coordination, and execution to deliver a high-quality, cost-effective building solution to the client.

What we offer

Committed To maintain or support a process continuously over time

Our quality of work remains consistent throughout the project lifecycle and we integrate sustainable practices into their processes, aiming to minimize environmental impact and promote long-term viability. 

Unwavering dedication to excellence, safety, sustainability, timeliness, client satisfaction, and ongoing improvement in all aspects of its operations.

 
 
 
 
  • Vision

    To become the most respected and prominent service company in our industry -known for our dedication to excellence in everything we do.

  • Mission

    To bring the industry a new standard of quality, crafts- manship, safety and technical support at a competitive price while making customer satisfaction our top priority.

  • Proverb

    Strong foundations build tall towers: Just as a solid base is crucial for a sturdy building, meticulous groundwork is essential for successful construction projects.

HOW IT WORKS

Easy Steps & Solutions

PEB, or Pre-Engineered Building, is a construction method commonly used by construction companies for its efficiency and cost-effectiveness. The construction process typically involves several key steps:

Design and Engineering

 Initial phase involves conceptualizing the building's design and engineering its structural elements

Fabrication of Building Components

Building components such as columns, beams, purlins, and panels are manufactured off-site in a factory-controlled environment.

Transportation and Logistics

After fabrication, the pre-engineered building components are transported to the construction site.

Erection and Assembly

Once the building components are delivered to the site, the erection and assembly process begins.

We are a construction firm and take up all kinds of projects including commercial and residential construction, architectural designing and interior designing.

© Copyright ABS Designers 2024 all rights reserverd. Design and developed by Hope Connect Technology

Get In Touch

You have been successfully Subscribed! Ops! Something went wrong, please try again.